Nashville & Middle Tennessee Pool Surface Preparation

Pool Surface Preparation & Coating Removal Start With the Right Foundation.

Professional resurfacing begins before the new finish is ever installed. Pool Tech Surfacing provides specialized pool surface preparation, coating removal, dustless blasting and hydroblasting for appropriate residential, builder, remodeling and commercial projects.

With more than 25 years of pool industry experience, our team evaluates the existing surface and uses the appropriate preparation process to get the pool ready for the next phase of renovation or resurfacing.

Serving Nashville, Middle Tennessee & select larger regional projects throughout the Southeast.

25+ YEARS Pool Industry Experience
SPECIALIZED PREP Professional Equipment
RESIDENTIAL & COMMERCIAL Plus Contractor Projects
NASHVILLE & Middle Tennessee
Empty swimming pool with a clean prepared surface ready for resurfacing
Preparation Before Installation

The Finish Is Only as Good as the Surface Beneath It

A new pool finish needs the right substrate beneath it. Existing paint, deteriorated plaster, failing coatings and other surface conditions can interfere with the next system if they are not properly evaluated and prepared.

Pool Tech Surfacing approaches preparation as its own critical phase of the project. Depending on the existing pool and material, the work may include coating removal, plaster removal, mechanical preparation, cleaning and other steps needed to create an appropriate surface for the next installation.

  • Existing pool paint and coating removal
  • Pool plaster removal and preparation
  • Preparation for resurfacing systems
  • Renovation and remodeling projects
  • Standalone prep for builders and contractors
  • Residential and commercial pool projects
Specialized Surface Preparation

Dustless Blasting & Hydroblasting

Different surfaces require different preparation methods. Pool Tech Surfacing evaluates the existing material and project requirements before determining which process is appropriate.

Technician using dustless blasting equipment to remove old coating from an empty swimming pool
Painted Pools & Coatings

Dustless Blasting

Dustless blasting can be used on appropriate projects to remove existing pool paint and coatings that must come off before the next resurfacing system is installed.

The goal is controlled removal of unsuitable material while preparing the underlying substrate for the next stage of work. Every pool is evaluated before the preparation method is selected.

Ask About Dustless Blasting
Technician hydroblasting an empty swimming pool wall to remove old plaster during surface preparation
Plaster Removal & Preparation

Hydroblasting

Hydroblasting can be used on appropriate projects to remove existing pool plaster and prepare the substrate for renovation or a new finish system.

The process uses high-pressure water to perform specialized removal and preparation work without treating every pool as if it requires the same solution.

Ask About Hydroblasting
Why Surface Preparation Matters

Good Resurfacing Starts Before the Finish

Preparation is about understanding what is already on the pool, removing unsuitable material where required and creating the right starting point for the next system.

01

Remove Unsuitable Material

Existing paint, coatings or deteriorated plaster may need to be removed before the next resurfacing system can be installed.

02

Expose the Real Substrate

Proper preparation helps reveal the underlying surface so its condition can be evaluated more accurately.

03

Prepare for the Next System

Different resurfacing systems have specific preparation requirements, making the substrate a critical part of installation.

04

Support Better Project Execution

A disciplined prep process gives homeowners, builders and contractors a cleaner starting point for the next phase of work.

Our Surface Preparation Process

From Existing Finish to Prepared Substrate

Every project is different, but professional surface preparation follows a deliberate process from evaluation through completion.

01

Evaluate

We assess the existing finish, substrate, deterioration and project goals.

02

Protect

The work area and surrounding surfaces are prepared for the selected process.

03

Remove

Appropriate coatings, paint or plaster are removed using the selected method.

04

Clean & Prepare

The substrate is cleaned and prepared for the next stage of renovation.

05

Ready for Next Step

The prepared surface is reviewed before resurfacing or contractor handoff.

A Specialized Partner for the Trades

Surface Preparation for Pool Builders, Remodelers & Contractors

You do not have to hire Pool Tech Surfacing for the final coating to bring our preparation capabilities into your project.

Builders, remodelers and contractors can use Pool Tech Surfacing for appropriate standalone coating removal, plaster removal and substrate preparation when specialized equipment or an experienced pool-surface crew is needed.

Tell us what is on the pool now, what needs to come off and what system or phase follows. We can evaluate whether our preparation services are a fit for the project.
Discuss a Contractor Project
Pool professionals reviewing an empty swimming pool surface preparation project
Residential • Builder • Contractor • Commercial

Professional Preparation for a Range of Pool Projects

Homeowners

Prepare an aging or previously coated pool for a professional resurfacing or renovation project.

Pool Builders

Bring in a specialized crew for appropriate preparation and removal work before the next construction phase.

Remodelers & Contractors

Use Pool Tech Surfacing as a standalone surface-preparation partner when specialized equipment or expertise is needed.

Commercial Properties

Professional preparation for appropriate hospitality, community, recreational and other commercial aquatic renovation projects.

Local Service. Specialized Equipment.

Pool Surface Preparation Throughout Nashville & Middle Tennessee

Pool Tech Surfacing primarily serves projects within approximately three hours of Nashville depending on project size, scope and scheduling.

Have a larger project outside Middle Tennessee? Select projects elsewhere in Tennessee and throughout the Southeast may also be considered.

View Our Service Area
Nashville
Franklin
Brentwood
Murfreesboro
Hendersonville
Gallatin
Lebanon
Clarksville
Columbia
Cookeville
Surface Preparation Questions

Frequently Asked Questions

Why does pool surface preparation matter?
Surface preparation helps create the proper starting point for resurfacing or renovation. Existing paint, coatings, deteriorated plaster and other materials may need to be removed or prepared before the next system can be installed.
What is dustless blasting used for on a pool?
Dustless blasting may be used on appropriate projects to remove existing pool paint or coatings before resurfacing. Pool Tech Surfacing evaluates the existing material and substrate before recommending the preparation method.
What is hydroblasting used for?
Hydroblasting may be used on appropriate projects for pool plaster removal and substrate preparation. The exact method depends on the existing surface and the requirements of the next phase of work.
Do you prepare both concrete and previously coated pools?
Pool Tech Surfacing evaluates concrete pools, previously painted pools and other applicable surfaces to determine the appropriate removal and preparation process for the project.
Can you remove an old pool coating without installing the new finish?
Yes. Surface preparation and coating removal may be provided as standalone services for pool builders, contractors and remodelers when the project is an appropriate fit.
Do you provide surface prep for pool builders and remodelers?
Yes. Pool Tech Surfacing works with builders, remodelers and contractors that need specialized pool-surface preparation, coating removal or plaster removal before their next project phase.
How do you determine which preparation method to use?
The decision depends on the existing finish, substrate, condition of the pool, material that must be removed and requirements of the next system or construction phase. The pool is evaluated before the preparation method is selected.
How long does pool surface preparation take?
Timing depends on pool size, existing surface, amount and type of material being removed, site conditions, equipment requirements and project scope. Pool Tech Surfacing can provide a more accurate schedule after evaluating the project.
Can surface preparation be part of a complete resurfacing project?
Yes. Pool Tech Surfacing can perform preparation as part of a complete pool resurfacing project or as a standalone specialized service, depending on the project.
What areas does Pool Tech Surfacing serve?
Pool Tech Surfacing primarily serves Nashville and Middle Tennessee, generally focusing on projects within approximately three hours of Nashville depending on size and scope. Select larger projects elsewhere in Tennessee and throughout the Southeast may also be considered.

Need the Old Surface Removed Before the Next Step?

Tell Pool Tech Surfacing what is on the pool now, what needs to be removed and what comes next. We’ll help you determine the appropriate preparation approach.